Backyard excavation, grading, trenching and hauling in Gilbert, Chandler and Sun Lakes(602) 905-4044
ExcavationGilbert, Arizona Call today
Menu

Here's what Gilbert and the agencies above it publish about digging, grading and pools.

Town of Gilbert: engineering permits

Gilbert's Engineering Construction Permit Checklist (October 2025) says:

  • Grading permits for subdivisions and commercial projects need a county dust control permit, an ADEQ stormwater pollution prevention plan permit, a Notice of Intent and a grading and drainage plan.
  • The applicant must be the contractor performing the work; a general contractor can't apply for subcontractors.
  • A certificate of insurance for at least $1,000,000 in general liability, naming the Town of Gilbert as additional insured, is required.
  • A drywell permit covers building a new drywell for an existing drainage system that isn't part of another construction permit.
  • Work on or near a roadway, or a haul route permit, needs a Traffic Engineering Application.
  • Permits aren't issued until all approvals are granted and fees are paid.

We didn't find a published rule for small residential yard grading. Development Services: 480-503-6700.

Town of Gilbert: pools

Pools go in side or rear yards at least 3 feet from property lines (5 feet from the street side on a corner lot), behind a 5-to-6-foot barrier with self-closing, self-latching gates. See pool fence and setbacks.

Maricopa County: dust

A dust control permit is required for disturbing 0.10 acre (4,356 square feet) or more. Rule 310 applies to every dust-generating operation.

State of Arizona

  • Arizona 811 before any digging. See before you dig.
  • Contractor licensing through the Registrar of Contractors: R-2, A-5 or CR-2 for excavating and grading.
Downtown Gilbert intersection with the water tower behind
Downtown Gilbert. Development Services handles the town's permits. Stock photo: Cygnusloop99 / Wikimedia Commons, CC BY-SA 3.0.

Not legal advice. A summary of public documents current as of the date below. The town, the county and the state set what your project needs.

Questions and answers

Who can apply for an engineering permit in Gilbert?

Gilbert's checklist says the applicant must be the contractor performing the work, with at least $1,000,000 in general liability insurance naming the town as additional insured.

Get it quoted

Fill in the form or give us a call, and a local excavation contractor will be in touch. There's no cost to ask.

Call (602) 905-4044

If it goes to voicemail, leave your name, number and address, and tell us what you need dug or moved.

Get an excavation quote

A local contractor will contact you about your request. Privacy